Name £º The Fifth International Pipeline Exhibition
Date £º Oct.16-18, 2008
Venue £º Langfang International Conference & Exhibition Center
Interpipe 2008 attracts a select group of buyer's from all around the globe and from all aspects of pipeline industry. A great deal of pipeline projects are on building now or will be built the following years! Organizations want to offer the chance to make the contractor unit, producer unit and construction unit to communicate with each other on the exhibition.
No.1 Exhibition Area
1. Pipe and tube area.
2. Construction machine, equipments and material.
3. Oil & gas transportation and storage equipment& technology.
4. Gas pipeline technology & equipment
5. Integrated operation management.
No.2 Main Products:
1. Pipeline steels, steel tube, GRP, rubber and PE\PVC\CPVE tube.
2. Pipeline construction equipment and special pipeline equipment.
3. Pipeline detection instrument, leak hunting instrument, pipeline cleanout equipment.
4. Pipeline welding equipment and material
5. Pipeline communication equipment and information management system.
6. Pipeline pump, valve, measure instrument and other instrument.
7. Oil & gas storage equipment and technology.
8. Pipeline anticorrosion, heat preservation material, fireproof material, technology.
9. Benthal pipeline equipment and other take-over equipment, LNG take-over equipment, LNG transportation equipment and material.
No . 3 Cost Detailed Rules
Items |
Exhibition Fee (USD) |
Standard Booth |
3000 |
Indoor Raw Space |
300/ m2 |
Outdoor Raw Space |
150/ m2 |
Exhibitor's Fee |
200/each one |
Technology Seminar |
1500/per hour |
Sequence of Attending Exhibition
1. The type and proportion of Booth should be confirmed first, then fill in the application from and mail or fax it to the organizer(Please download the floor plan of the Interpipe 2008 and application form), or register on web( ), we will give you a confirmation.
2. 50 percent of the total fee should be paid to the organizer after the Agreement within a week.
3. The deadline of the payment is on 1 st , Sep, 2008, the organizer will post the invoice to the companies who have faxed or posted the agreement and paid the total fee.
4. Before the 1st, Sep, 2008, the organizer should mail the <Exhibitor Manual>, and help the exhibitor prepare for this exhibition. |